We already have the technology to break down and repurpose end-of-life playground rubber. Now we’re building the recovery and resupply operation around it, with digital batch traceability planned.
When playgrounds are refurbished, the safety surfacing beneath them is often treated as waste.
We believe that material deserves another chapter. Rubber Revolution is developing a practical way to recover removed wet pour rubber, process it and resupply suitable material for use in new playground base layers.
It’s an ambitious idea grounded in an existing industry challenge — and built with the people who understand that challenge best.
Developed alongside an established surfacing business.
Technology in place
We have the technology to break down and repurpose recovered rubber.
Independent validation
Validation received. Assessment details will be shared in a future update.
THE COMMERCIAL MODEL
Two Revenue Streams. One Circular Solution.
We’re developing a model that aims to generate revenue at two stages of the playground surfacing lifecycle: recovering the old surface and supplying suitable material for the next installation.
01 — RECOVERY
Value in the lift.
Rubber Revolution intends to earn revenue from lifting and recovering end-of-life wet pour surfacing during refurbishment projects.
Removed surfacing is a potential source of material to process, as well as a practical recovery challenge to manage.
Recovered rubber would be processed, cleaned and graded for potential reuse in playground safety surfacing base layers, subject to appropriate material validation.
We intend to earn additional revenue by supplying suitable recovered material to playground installers and surfacing contractors.
Proposed income: recovered material supply
01Existing playground
02Removal & recoveryRecovery service revenue
03Processing
04Reusable rubberMaterial resupply revenue
05New playground
↶ Future refurbishment could start another recovery cycle — subject to material suitability and validation.
Proposed commercial model — these are intended revenue streams, not established trading income or contracted revenue.
We have access to recovered material and the technology to break it down and repurpose it. Independent validation has now been received. The focus remains on optimising the process, managing contamination, commercial modelling and preparing pilots.
Playground safety surfacing serves schools, public parks, housing developments, leisure facilities and community spaces throughout the UK. As installations reach the end of their useful life, refurbishment creates an opportunity to recover material that might otherwise enter conventional waste streams.
01 / RESEARCH AREA
UK playgrounds & play sites
Awaiting research
Scope and source awaiting confirmation
02 / RESEARCH AREA
Annual refurbishment activity
Awaiting research
Reporting period and source awaiting confirmation
03 / RESEARCH AREA
Potential wet pour recovery
Awaiting research
Tonnes per year and assumptions awaiting confirmation
04 / RESEARCH AREA
Addressable recovery market
Awaiting research
Annual value, scope and source awaiting confirmation
Research placeholders — no market estimates are claimed here. Each figure will require a defined scope, date, assumptions and supporting source before publication. Not all play sites use wet pour surfacing.
AN ILLUSTRATIVE PROJECT
One refurbishment. A potential second life.
Follow a hypothetical medium-sized playground recovery project. This example explains how the proposed model could work; it is not a completed project, quotation or forecast.
01
Lift the existing surface
A hypothetical medium-sized playground is scheduled for refurbishment. The existing wet pour surface is removed.
02
Recover and transport
The recovered rubber is kept identifiable and moved for processing. Site conditions and transport requirements affect the costs.
03
Separate and process
Contaminants are separated and the rubber is processed. The amount of usable material depends on input condition and recovery yield.
04
Validate suitability
Recovered material is assessed for the intended application. Reuse depends on appropriate testing and quality checks.
05
Supply for a future installation
Suitable processed material could be supplied to a surfacing contractor for a future playground base layer.